How to schedule a report to generate automatically?

How to schedule a report to generate automatically?

The user may want to schedule a report to generate in an automatic way. The system automatically generates the report based on the schedule frequency and time set by the user. The manual intervention for the report generation is automated and this saves the user’s time.  

1. Click the "Reports” module from the left panel. 

2. Tap on the “Scheduled Reports” from the top section. 

3. Then select, “+New Scheduled Report” from the subsection. 

4. Add the required details and tap on the “Create Scheduled Report” button and the schedule will be done in a single click.  

A) Enter the Schedule Report Name” details.  

   B) Enter the “Report Type” detail. This can be either “Default Report” or “Custom Report. 

    C) Choose the required “Report Module” detail and select the respective “Choose Report. 

    D) Fill in the necessary “Job Category” and select the schedule frequency which can be “Daily, Every Week, Every Month, and Every Year.” 

    E) The report sending time can be set using the Send At” option and the frequency of days schedule can be set using “Report Data Duration. 

    F) The “Send To” email address, email subject, and the email body to be filled.  


5. The auto-generation of reports for the job is easily done using the above-said steps. 

    • Related Articles

    • How to use the “Generate by” option for the on-demand reports?

      Navigation: Reports and Analytics --> Scheduled Reports The system automatically generates the information based on the schedule frequency and time set by the user. The manual intervention for the report generation is automated, saving the user ...
    • How to issue (schedule) PPMs into Jobs in the Zuper web app?

      The Planned Preventive Maintenance (PPM) should be done periodically to prevent asset failures. At the same time, these maintenance tasks can also be converted to jobs that field executives can complete on scheduled dates. But, if you've missed ...
    • How to configure PPM (Planned Preventative Maintenance) to auto-generate Jobs?

      The user may want to create a job based on the PPM. The process gets completed quickly with the new "Generate before" field. The system automatically generates the PPM job on that date, thus saving ample time for the user. Navigation: Assets --> ...
    • How to manage Employee's Schedule?

      To view and reschedule the jobs based on the employee, the user can use the Employee Schedule. 1. Select the "Schedule" icon from the panel. To access the Employee Schedule, click on "Dispatch Board." 2. Drag and drop the existing job card to modify ...
    • How to update employee roster/schedule ?

      The employee roster/schedule in Zuper can be updated in two ways, Directly from the Actions column in the Employee tab. From the employee's personal page. Steps to edit the employee details directly from the Actions column in the Employee tab Log in ...